Just a few seconds are enough for the main 65 KVA power generator unit to activate. It features an automated transfer switch system from the main power supply (DEI) and fully supports all building operations.
In the rare event that an issue arises in that area, a second 15 KVA generator unit has been installed in a completely separate location. This unit powers the Signal Receiving Center as well as the company's entire telecommunications backbone, ensuring the uninterrupted operation of the Central Monitoring Station.
Finally, independent of the generators, all electronic equipment serving the Central Station is supported by multiple On-Line UPS units and battery arrays.